ĐẶT ĐÓNG TÀU NẠO VÉT TẠI - TRUNG QUỐChttps://www.tengyuanpipes.com/CONDITIONS FOR RENTING TRAINING VESSELSFor ships: 1000 m / h & 20000 m3 / h. The ship has a suction function - Discharge of the transport ship or pushing it to the far shore up to 1.5 km - Load of 1000 tons to 2000 tons. In case, the lessee needs to push more than 1.5 Km, the lessee will discuss with the shipowner to buy more pumps.
CONDITIONS FOR RENTING OF DRINKING SHIP - 1000m3 / hour(According to Dutch design approved by DKK)
Newly built vessels include:
- Ship engine: 550 HP.
- Hydraulic propeller system (Cross-bow): 120 HP
- Output of main pumps: 2,200 HP - 5,600 m3 / h - Pressure head 60 m - (Sludge + Sand 100%: 1000 m3 / h).
- Hydraulic system, head dredge: 100 Kw
- High pressure water system using sand suction: 100 Kw
- Submersible pump for sand mining - 315 Kw - (02 pumps)
- Generator: 1,000 Kw (01 machine)
- Crane: 18 m - 20 Tons
- Nose crane: 8 m 5 tons
- System of iron buoys + rubber tubes, above water: 120 m
- 50 HP construction boat
- Ship size: (42 m x 9 m x 1.5 m). (Ship operates at max depth: 18 m)
1-The charterer, must prove, I have a project, the construction dredging contract with the minimum level as follows:
- Minimum construction time: 12 months
- Minimum construction volume: 2,000,000 m3
2-The charterer, responsible for: All pipelines, construction equipment. (In addition to the shipboard area). Provide petrol and oil enough for daily operation.
3-After receiving the ship, the charterer must organize and staff the crew fully, to bring the ship into good operation. The owner of the ship announced that 02 officers followed the ship, doing the task: Guide and supervise the operation of the lessee's ship.
4-Rental price is calculated as follows:
Based on the completed volume in the month of the party (Chartering). The charterer will pay the ship rental to the ship owner at the price: 20,000 VND / 01 m3. (Petrol - Party A provides)
-The above price is a temporary price, depending on the difficulty of the project, the two parties discuss and adjust the price accordingly, before signing the charter contract.
5-Before receiving the ship for 90 days, the lessee must transfer the deposit, in the amount of VND 20 billion to the shipowner.
-The deposit amount will be recovered by the lessee as follows: Based on the value of the monthly rent that the lessor is entitled to. Then 70%, the ship owner, pay the charterer, deduct from the deposit, the remaining 30% will pay the ship owner.
-In case, the project runs out of volume, but the deposit amount is still not deducted. The two parties shall make a written record to record the following work, accounting for the next deduction.
(Customers may not hire and buy off the entire ship, for VND 40 billion)
CONDITIONS FOR RENTING - 2000m3 / hour TRAINING SHIP
(According to Dutch design approved by DKK)
Newly built vessels include:
- Ship engine: 550 HP.
- Hydraulic propeller system (Cross-bow): 120 HP
- Production of 02 main pumps: (2,200 HP - 5,600 m3 / h - 60 m pressure head) x 02 pumps.
(Mud and Sand output: 100%: 2000 m3 / h).
- Hydraulic system, head dredge: 200 Kw
- High pressure water system using sand suction: 200 Kw
- Submersible pump for sand mining - 315 Kw - (04 pumps)
- Generator: 1,500 Kw (01 machine)
- Crane: 18 m - 20 Tons
- Nose crane: 8 m 5 tons
- System of iron buoys + rubber tubes, above water: 240 m
- 50 HP construction boat
- Ship size: (45 m x 10.5 m x 2 m) .. (Vessel operates at max depth: 20 m)
1-The charterer, must prove, I have a project, the construction dredging contract with the minimum level as follows:
- Minimum construction time: 18 months
- Minimum construction volume: 3,000,000 m3
2-The charterer, responsible for: All pipelines, construction equipment.
3-After receiving the ship, the charterer must organize and staff the crew fully, to bring the ship into good operation. The owner of the ship announced 02 officers to follow the ship, doing the task: Guide and supervise the ship's operation of the lessee. Provide fuel and enough for daily operation.
4-Rental price is calculated as follows:
Based on the completed volume in the month of the party (Chartering). The charterer will pay the ship rental to the ship owner at the price: 20,000 VND / 01 m3. (Petrol - Party A provides)
-The above price is a temporary price, depending on the difficulty of the project, the two parties discuss and adjust the price accordingly, before signing the charter contract.
5-Before receiving the ship for 90 days, the lessee must transfer the deposit, amounting to VND 30 billion to the shipowner.
-The deposit amount will be recovered by the lessee as follows: Based on the value of the monthly rent that the lessor is entitled to, 70% shall be recovered by the lessee, deducted from the deposit, the remaining 30% will pay the ship owner.
-In case, the project runs out of volume, but the deposit amount is still not deducted. The two parties shall make a written record to record the following work, accounting for the next deduction.
(Customers may not hire and buy off the entire ship, for 60 billion VND)
CONDITIONS FOR RENTING TRAINING VESSELS
(Abdominal aspiration) 5000 tons 2200 m3
For 5000 ton dredge. Sediment storage capacity of 2200 m3. The vessel has the function of sucking into the abdomen
& Auto exhaust - Time of both suction and sand discharge: 3 hours.
CONDITIONS FOR VESSEL LEASE (Absorption) - 800m3 / hour
Converted (New) vessels from 5000-ton transports include:
- Capacity of ship machine: 2200 HP.
- Production of 02 main pumps: (1000 HP - 2,200 m3 / h - Pressure head of 60 m) x 02 pumps.
(Sludge production + Sand 100%: 800 m3 / h).
- Hydraulic system, head dredge: 75 Kw
- High pressure sand water system: 75 Kw
- Submersible pumps for sand mining - 150 Kw - (02 pumps)
- Generator: 700 Kw (01 machine)
- Crane: 18 m - 20 Tons
- System of iron buoys + rubber tubes, above water: 120 m
- 50 HP construction boat
- Ship size: (45 m x 10.5 m x 2 m) .. (Vessel operates at max depth: 20 m)
CONDITIONS FOR LEASEING DRAINING SHIP - 5000 Ton - 2200 m3 (Self-suction & self-discharge)
1-The charterer, must prove, I have a project, the construction dredging contract with the minimum level as follows:
- Minimum construction time: 18 months
- Minimum construction volume: 1,000,000 m3
2-The charterer, responsible for: All pipelines, construction equipment. (In addition to the shipboard area.) Provide fuel, enough for daily operation.
3-After receiving the ship, the charterer must organize and staff the crew fully, to bring the ship into good operation. The owner of the ship announced that 02 officers followed the ship, doing the task: Guide and supervise the operation of the lessee's ship.
4-Rental price is calculated as follows:
Based on the completed volume in the month of the party (Chartering). The charterer will pay the ship rent to the shipowner at the price of 3 USD / 01 m3.
-The above price is a temporary price, depending on the difficulty of the project, the two parties discuss and adjust the price accordingly, before signing the charter contract.
5-Before receiving the ship for 120 days, the lessee must transfer the deposit, amounting to USD 3,000,000
for ship owners.
-The deposit amount will be recovered by the lessee as follows: Based on the value of the monthly rent that the lessor is entitled to, 70% shall be recovered by the lessee, deducted from the deposit, 30% remaining. will pay for the ship owner again.
-In case, the project runs out of volume, but the deposit amount is still not deducted. The two parties shall make a written record to record the following work, accounting for the next deduction.
(Customers may not hire and buy off the entire ship, for: USD 6,000,000)
November 18, 2017.
DAI SON NAM JOINT STOCK COMPANY
Dredging vessel : IHC Beaver® 65 DDSP (manufactured in the Netherlands)
Reliable, fuel efficient, low maintenance IHC Beaver® 65 DDSP
high cost and productivity levels at all dredging depths.
This powerful dredger is equipped with modern technology.
Key features include:
• low cost per cubic meter
• a diesel direct driven submersible pump (DDSP) generates it
can be dredged at high mixed density
• Curve® impellers combine high efficiency with low energy consumption and suction performance
• first-class diagnostics and ergonomics
• wear-resistant parts for dredging pumps
• Certified Grade (BV Coastal Area)
• integrated spud shipping settings.
IHC Beaver® 65 DDSP Cutter hút Suction Dredge
Reliable and efficient
The IHC Beaver® is renowned for its sturdy, reliable construction
Works and great performance. To date, IHC Royal (IHC) has
supplied more than 800 of these standard cutter suction dredges
all around the world. Can be shipped and delivered from the warehouse
The IHC Beaver® dredgers can be dismantled for transport by road, rail or sea. A wide range of optional equipment is available, as well as additional ancillary equipment, such as work boats and exhaust pipes. These ships are mainly delivered from stock.
Service and Support IHC can provide a full package of spare parts, supportive maintenance, equipment training programs, service dredging consultants, and dredging operators for practical and operational guidance. to try on.
Dimensions Overall length (lift up), approx. 58.0m
Length over float 43.50m Width 12.44m
Depth 2.97m Side bridge 43.50 x 4.67 x 2.97m
Full deck draft 1.95m
Maximum standard dredging depth 18.0m
Suction pipe diameter 650mm
Exhaust pipe diameter 650mm Total installed power 2,819kW
Bladder and swing winch -30 rpm
Pulling rope, first layer 240kN
Maximum line speed 23m/min
Wire diameter 36mm
Drum diameter 762mm Cord length 150m
Dredge Pump Type IHC HR/MD 121-26-60, with Curve® impeller inside Caterpillar 3516C SCAC
Continuous motor power 1,825kW @ 1,600 rpm
Specific fuel consumption 206.9g/kWhr
Auxiliary power (cutter, winch and pole)
Engine type C32 DITTA Acert
Maximum power 994kW
Specific fuel consumption 207.2g/kWh
CutterType IHC 20-CB-ACR-2220-550
Power at shaft 700kW to absorb load peak
Diameter 2,220mm
Maximum speed, approx. 30 rpm
DANH SÁCH BƠM THỦY LƯC-NẠO VÉT CHÌM-LẮP RÁP TẠI VIỆT NAMCHARACTERISTICS NT PUMPS |
| TN 100 | TN 150 | TN 200 | TN 250 | TN 300 | TN 400 | UNIT |
Max - lưu lượng | 300 | 500 | 800 | 1250 | 1800 | 3150 | [m3/h] |
Max - vòng quay | 1350 | 1300 | 1200 | 900 | 750 | 600 | [rpm] |
Max - công xuất | 30 | 75 | 110 | 190 | 300 | 500 | [kW] |
Đường kính ống | Ø100 | Ø150 | Ø200 | Ø250 | Ø300 | Ø400 | [mm] |
Đường kính ống | Ø100 | Ø150 | Ø200 | Ø250 | Ø300 | Ø400 | [mm] |
Cỡ hạt | 50 | 75 | 125 | 130 | 155 | 210 | [mm] |
Weight (Bơm thủy lực) | 550 | 950 | 1200 | 2000 | 3500 | 7750 | [kg] |
Weight (Bơm điện) | 1000 | 1375 | 1900 | 2900 | 4600 | 9150 | [kg] |
Max - Áp lực thủy lưc motor | 250 | 250 | 250 | 250 | 300 | 300 | [bar] |
Max-Lưu lượng dầu - Bơm | 85 | 195 | 290 | 425 | 600 | 1000 | [L/min] |
Lưu lượng dầu - Đầu xén | 15-20 | 15-20 | 35-50 | 35-50 | 70-110 | 70-110 | [L/min] |
Lưu lượng dầu-Đầu xén đôi | 30-40 | 30-40 | 70-100 | 70-100 | 140-220 | 140-220 | [L/min |
Bộ máy cung cấp nguồn thủy lực.
CONDITIONS FOR RENTAL TRAINING PATTERN 5000 tons 2200 m3
For a 5000 ton ship. Capacity of sediment is 2200 m3. The vessel is suction in the abdomen & Automatic discharge - The time to both suck and sand discharge: 3 hours.
CONDITIONS FOR RENTAL TRAINING - 5000 MT - 2200 m3
1. The charterer must prove that he / she has a project or a dredging contract with the minimum level as follows:
- Minimum construction time: 12 months
- Minimum amount of construction: 1,000,000 m3
2-The charterer, responsible for: All pipelines, construction equipment. (Outside the ship's area).
3. After receiving the ship, the lessee shall have to organize and pay the crew of the crew in full to put the ship into good operation. The shipowner shall prepare two crews to accompany the vessel and shall perform the following tasks: Instruct and supervise the operation of the ship of the lessee.
4. Rental price is calculated as follows:
Based on the volume completed in the month of the party (Ship hire). The charterer shall pay the shipowner a fee of 2 USD / 01 m3 for the shipowner.
- The above price is the temporary price, depending on the level of difficulty of the project, the two sides discuss, adjust the price accordingly, before signing the charter boat.
5-Before accepting the ship 60 days, the lessee must transfer the deposit, amounting to USD 2.5 million to the shipowner.
- The amount of the deposit will be recovered by the lessee as follows: Based on the monthly rent rented by the lessor, 70% is deducted by the lessee from the deposit, 30% will pay the owner.
-In case, the project runs out of volume, the deposit still has not been cleared. The two parties shall make a minute for the latter to further account.
November 18, 2017.
DAI NAM NAM JOINT STOCK COMPANY