Nhận tổng thầu EPC-NM Nhiệt điện 250 MGAW/h-Austria
Received the EPC-thermal contractor 250 MGAW/h-Austria
CCPP and direct combustion plants - Gas and steam turbines and combustion.
BERTSCHenergy offers all possible combinations with gas and steam turbines to generate electricity and steam. When it comes to using fossil fuels, maximum energy efficiency is important. The maximum availability, flexibility and dynamism of our power plants are at the heart of our customers' economic success.
Parameter
Heat - up to 250 MWth
Electricity output of the gas turbine up to 100 MW
Air volume - 30 to 270 t / h
Vapor pressure - up to 160 bar
Steam temperature - up to 560 ° C
Depending on the required power and steam rates and in accordance with the flexibility requirements, we combine gas turbines, steam turbines and firing components together. As a general contractor, BERTSCHenergy provides all imaginative support in the construction of power plants:
Gas and oil-fired power plant with and without power in gas turbine Gas turbine solutions with heat recovery steam generator
Combined thermal power plant
Turbine Gas Turbine for single gas turbine or kinetic energy conversion between gas turbine and fresh air activity
Connect multiple gas turbines to a boiler
Fire with a variety of fuels such as special gases and heating oil
Considering customer needs is central to the philosophy of BERTSCHenergy. We are ready to face all challenges of limited construction area and limited processing time. Integration in existing buildings is also one of our strengths, as well as greenfield projects.
Natural circulation boilers, single and multi-pressure systems, hot and cold
Forms or hoses in the ceramic combustion chamber
HRSG (heat recovery steam generator) recovers heat from the gas turbine
HRSG is equipped with additional firepower
HRSG with optional air-operated air inoperative or failure of the gas turbine
Vertical or horizontal version
Controlling the temperature of superheated steam by an injection chiller or with a surface cooler